Hi. So OK, I’m back with photos. The builder’s vacation is over, and I’m relieved as my apartment has been sitting idle for the last 3 weeks or so, and I’m getting more eager and excited about moving in.
So anyway, work is underway again, and things continue to take shape.
Here’s the living room:
IMG_1219.jpg

And study, where you can see the skeleton of the shelving on the walls:
IMG_1218.jpg

The lighting has been placed, and you can see that the insulation has already gone in. Double thickness I asked - Dutch winters can be quite chilly to say the least!
IMG_1217.jpg

A lovely alternative view:
IMG_1219.jpg

I was pretty devastated to find out that I couldn’t move this wall as planned, as it’s load-bearing and a potential nightmare to the whole building if shifted. I’m over it now; these thing happen in projects. I need to replan the bedroom area slightly. I’m really through with planning already!
IMG_1212.jpg

I’m told that the whole place is 5 weeks off finishing. I’m skeptical to hear that, but hope to be surprised!
IMG_1210.jpg

1 Comment »

  1. Great article.

    My web site Hunts International Removals; Kristie,

    Comment by Kristie — January 11, 2016 @ 12:03 am

Leave a comment

RSS feed for comments on this post.
TrackBack URI